Jump to content



Featured Articles

Check out the latest featured articles.

File Library

Check out the latest downloads available in the File Library.

New Article

Product Viscosity vs. Shear

Featured File

Vertical Tank Selection

New Blog Entry

Low Flow in Pipes- posted in Ankur's blog

0

Upgrading Biogas To Biomethane Project


No replies to this topic
Share this topic:
| More

#1 moutaz2

moutaz2

    Brand New Member

  • Members
  • 1 posts

Posted 10 July 2020 - 04:22 PM

i was asked to design a reactor that convert carbon dioxide to methane in upgrading biogas process to biomethane using aspen plus

I have problem in inserting the data in aspen plus after i press run there is no changing in the outlet stream in the same time no error appear. i think the problem is unit problem but couldnot know exactly.

the reaction is happened in two steps first water gas shift reaction then co methanation

????????2 + ????2→    ???????? + ????2????               ΔH = -40.6 kJ/mol

3????2 + ???????? →    ????????4 + ????2????           ΔH 298 K = 206 kJ/mol

i already have the kinetics and rate of reaction based on  Langmuir-Hinshelwood-Hougen-Watson (LHHW) kinetics model

I get my information from this paper, tried to put screenshot from it but i couldnot 

https://www.academia...tricity_storage

 any help ?






Similar Topics