Hi All,
I have understood the requirement of RO in the drain line from the below post.
https://www.cheresou...n-drain-system/
but to clarify is there an concern if the RO is placed in the upstream of the DBB.
Regards,
Sam
|
Posted 08 March 2022 - 09:34 PM
Hi All,
I have understood the requirement of RO in the drain line from the below post.
https://www.cheresou...n-drain-system/
but to clarify is there an concern if the RO is placed in the upstream of the DBB.
Regards,
Sam
Posted 09 March 2022 - 03:40 AM
I have understood the requirement of RO in the drain line from the below post.
https://www.cheresou...n-drain-system/
but to clarify is there an concern if the RO is placed in the upstream of the DBB.
Hi Sam,
If there is no phase change across the RO due to draining action; appears no specific concern to be expected for RO placing at upstream...
If there is phase change (liquid to vapor/two phase); putting the RO at downstream is highly preferred...
Handling The Limited Capacity Of Flare SystemStarted by Guest__1angelia23_* , 05 Apr 2024 |
|
|
||
Closed Drain SystemStarted by Guest_Falah_* , 26 Mar 2024 |
|
|
||
Lube Oil System For TurbomachineryStarted by Guest_bckesim_* , 03 Mar 2024 |
|
|
||
Design Criteria For Sizing Sump Drum Of Close Drain System In Tank FarStarted by Guest_AnbIran_* , 28 Feb 2024 |
|
|
||
Fail Open And Fail Close Of Instrument Control ValvesStarted by Guest_panagiotis_* , 04 Feb 2024 |
|
|