"I am currently working on the process design of a natural gas CO2removal unit using activated MDEA (aMDEA) solution. The design parameters are: gas flow rate of 77 MMSCFD, inlet CO2 concentration of 15%, and outlet CO2 concentration of ppm}. Preliminary calculations show that the amine regenerator reboiler duty is 26 MW, heated by hot oil. With such a massive heat load, a single kettle reboiler would result in an extremely large equipment size, which is causing me a major headache. Does anyone have suggestions on how to optimize this reboiler configuration
|
|
Amine Re Generator Reboiler
Started by guoyinyanliner, Today, 04:55 AM
1 reply to this topic
Share this topic:
#1
Posted Today, 04:55 AM
#2
Posted Today, 05:41 AM
This may not be the right equipment!
Check for direct fire furnace for your application.
Take a look at the link, it may help you out.
Good, Better, Best: Choosing the Right Heating Method for Your Amine System
Breizh
Similar Topics
Thermosyphon Reboiler ProblemStarted by Guest_aliebrahem17_* , 22 Oct 2025 |
|
|
||
Reboiler Necessity For Condensate StabilizationStarted by Guest_Ammart42_* , 11 Oct 2025 |
|
|
||
Distillation Column Reboiler QuestionsStarted by Guest_AlanC079_* , 07 Jul 2025 |
|
|
||
Levels For Kettle Type ReboilerStarted by Guest_RajD_* , 04 Apr 2025 |
|
|
||
Phe As ReboilerStarted by Guest_Chemeng40_* , 20 Feb 2025 |
|
|

FB





