Dear all
For cooling of 4200 Cubic Meter/Hour water with refrigeration package(refrigerant:R-134a) and cooling duty of 50 MW,considering the available conventional sizes and capacity, what is the optimum number of packages(also arrangement of each package e.g. No. of parallel compressors) and the general criteria which governs the selected arrangement?
Regards
|

Refrigeration Package
Started by fallah, Nov 18 2007 11:35 AM
2 replies to this topic
Share this topic:
#1
Posted 18 November 2007 - 11:35 AM
#2
Posted 19 November 2007 - 09:23 AM
I would call a vendor or two and find out from them. There are a few considerations, such as available plot space, pre-investing for possible expansion, turndown, that you may want to take into account when making your decision. Otherwise, usually, you would try to have as few packages as you can (i.e. the biggest size). Also, only you can decide how reliable the system should be, which will then result in a requirement for sparing.
#3
Posted 19 November 2007 - 12:15 PM
Dear joerd
Thanks in advance for your kind reply.
Regards
Thanks in advance for your kind reply.
Regards
Similar Topics
Jt Based Hcdp Design V/s Mechanical Refrigeration Hcdp Unit.Started by Guest_BabRafiq1_* , 19 Apr 2024 |
|
![]() |
||
![]() Nitrogen PackageStarted by Guest_Ali4269278331_* , 06 Apr 2024 |
|
![]() |
||
Hydrocarbon Dew Point Control Using Propane Refrigeration Loop.Started by Guest_BabRafiq1_* , 10 Jul 2023 |
|
![]() |
||
Design Of Single Stage Propene Refrigeration SystemStarted by Guest_devilr_* , 22 Jun 2023 |
|
![]() |
||
Selecting Property Package For Water And Air Mixture In Aspen Hysys/plStarted by Guest_Sol.Daray_* , 02 Oct 2022 |
|
![]() |