Posted 06 April 2024 - 08:00 PM

hi, our site equip with nitrogen package as portable. this package consist of storage vessel, evaporator and N2 liquid to gas. the location of N2 package is near the oil storage tanks approx. 15mt far from together. i would like to know in the process plant layout this arrangement is correct or not? which is standard refer for this layout?

 

thanks

Ali



#2 fallah

fallah

    Gold Member

  • ChE Plus Subscriber
  • 4,991 posts

Posted 06 April 2024 - 08:49 PM

hi, our site equip with nitrogen package as portable. this package consist of storage vessel, evaporator and N2 liquid to gas. the location of N2 package is near the oil storage tanks approx. 15mt far from together. i would like to know in the process plant layout this arrangement is correct or not? which is standard refer for this layout?

 

 

Hi,

 

As the package is portable, let's know about your main problem?



#3 breizh

breizh

    Gold Member

  • Admin
  • 6,441 posts

Posted 06 April 2024 - 09:11 PM

Hi,

To second Naser, what is your fear? 

 N2 unloading? 

 Oil flammability?

Did you check with your HSE manager and/or the fire brigade in your area?

 

Note: You may have specific regulations in your country, check with the safety bureau.

 

Breizh



#4 shvet1

shvet1

    Gold Member

  • Members
  • 400 posts

Posted 09 April 2024 - 12:10 AM   Best Answer

Equipment siting/layout is not a simple question as so many factors are involved. Your question concerns zoning (fire, ex) - note that any option is possible if it had been justified properly. Resulted risk rate is the only issue.

 

Start with consulting your local insurance company

https://files.engine...Association.pdf


Edited by shvet1, 09 April 2024 - 12:16 AM.


#5 Ali4269278331

Ali4269278331

    Junior Member

  • Members
  • 27 posts

Posted 09 April 2024 - 01:33 PM

 

hi, our site equip with nitrogen package as portable. this package consist of storage vessel, evaporator and N2 liquid to gas. the location of N2 package is near the oil storage tanks approx. 15mt far from together. i would like to know in the process plant layout this arrangement is correct or not? which is standard refer for this layout?

 

 

Hi,

 

As the package is portable, let's know about your main problem?

 

thanks dear Fallah, please consider HAZOP and HAZID in your answer. our problem are based on HSE. 



#6 Ali4269278331

Ali4269278331

    Junior Member

  • Members
  • 27 posts

Posted 09 April 2024 - 01:35 PM

thanks , please consider HAZOP and HAZID in your answer. our problem are based on HSE. 



#7 Pilesar

Pilesar

    Gold Member

  • Members
  • 1,439 posts

Posted 10 April 2024 - 06:09 AM

There is no single right way to lay out equipment in a plant.The HAZOP/HAZID will have questions like 'what are the consequences of damage to the nitrogen package? Is the nitrogen package at risk of external fire or other damage?' If there is a hazard identified, then it must be safeguarded or accepted.