I want sizing a burn pit for 20000 kg/h oil by this composition:
10% C5
20% C6
20% C7
30% C8
20% C9
by T=30 c
& P= ATM
I determined the liner regression rate of the liq. surface by this method: R=1.27*(10^-9) Q/(HvM)
Q W) heat released by combustion
Hv:(Mj/kg) heat reqired to vaporize liq.
M: (kg/h) incoming to burning
But the result incorrect.
Please guide me
Thanks.
|