Question: Are there any general rules for flushing slurry lines?
Keywords: slurry,slurries,flushing,flush,velocity,fluid,volume,rules,recommend,recommendations
Answer: Slurry lines should be flushed with a minimum fluid velocity of 10 ft/s and the total flushing liquid volume should equal 3-6 times the total piping volume.