Hi Everybody,
We are considering a centrifugal compressor with LP section and HP section driven by a single turbine.
LP suction is from a 150 psig production separator and discharges 450 psig. HP suction is from LP discharge joined by a 450 psig production separator gas and discharges at 1100 psig. The design capacity is 50 MMSCFD for both LP section and HP section.
The problem is there are not much LP gas (about 2 MMSCF) at the early production phase. The question is if and how much we have to letdown gas from 450 psig to 150 psig for balancing the compressor LP section and HP section operation.

FB