Hi, good morning everyone,
i'm designing a methanol top unloading system by rail track, with a certain number of un-loading arms to select. Two tanks are used to store the product. This is the fist time that i design a such system. Kindly give me some reference (pfd, pid or book) on proceeding opportunely with the design, i woulb be very grateful to you.
Regards
Fortunato