Dear all,
Most of the small Glycol dehydration units the Contactor Tower (containing gas) is located on the same skid with the Fire Tube Boiler.
Is there any standard that permits that type of installation
And what are the safety precautions that should taken in order to place the tower next to the fire tube boiler
Edited by omarzohairy, 11 March 2018 - 02:40 AM.