Dear Sir,
I will transfer cracker bottom product via pipeline (most of them on pipe rack).
The compositions are shown below:
1. Xylene 0.06% mole
2. C9 23.16% mole
3. 204-288 C-PGO 42.36% mole
4. 288+ C-PFO 33.08% mole
Operating temperature 90 degree C
Pressure 15 kscg
Density 990-1040 kg/m3
Moreover, new pipeline out from battery limit to the other battery limit (on pipe rack 5 km.) shall be designed without any flanges.
Refer to above information, I don't think that the leakage detection shall be required.
Furthermore, cracker bottom is quite different with LNG, LPG, Ethylene which will be vapor cloud if it's leak.
In addition, the pipeline shall be designed to be on pipe rack and far away from excavation.
I would appreciate it if you could give me the advice about my decision.