Jump to content



Featured Articles

Check out the latest featured articles.

File Library

Check out the latest downloads available in the File Library.

New Article

Product Viscosity vs. Shear

Featured File

Vertical Tank Selection

New Blog Entry

Low Flow in Pipes- posted in Ankur's blog

0

Refinery Start Up


1 reply to this topic
Share this topic:
| More

#1 Divid Kelin

Divid Kelin

    Veteran Member

  • Members
  • 48 posts

Posted 13 April 2021 - 08:51 AM

In our refinery we have to tanks for flushing oil which is used for flush the Hydrocraker and diesel unit
Flushing oil required for Hydrocraker is 16000m3/hr
Flushing oil required for Diesel unit is 12000m3/hr
Each of tanks capacity around 4800m3
How much required time to fill up the tanks ?
The capacity of tanks not enough so how we can solve this issue there is any idea for that ?as you know flushing it will take time

#2 Pilesar

Pilesar

    Gold Member

  • Members
  • 1,342 posts

Posted 13 April 2021 - 11:16 AM

16000m3/hr oil flow seems ridiculous. That is 70,000 gpm. Does your post accurately state what you want it to state?






Similar Topics