Hi,
I ma trying to find conceptual cost estimate of a PSA unit delivered as a package , making high [purity hydrogen. Let us say it has 10 or 12 beds, making h2 from reformer shifted syngas. the vendor as mentioned that freight on board(FOB) cost may be close to 5 million. I am wondering what factor can i use to arrive at installed cost for such an item in a US gulf coast location. factor of3 or even higher?